
TL;DR: Solar panels last 25 years or more, so the roof under them needs to last just as long. If your roof is aging, worn, or already leaking, replace it before the panels go up. Putting a solar array on a failing roof means paying to remove and reset those panels later, which is a costly, avoidable headache.
Going solar is one of the best upgrades you can make to a home. But is your roof ready to carry a solar system for the next two or three decades? And, can you replace a roof with solar panels?
The topic of roof replacement with solar panels matters because the roof and the panels are a package deal, and any good roofing contractor in Los Angeles will tell you that getting the order right saves you money.
Here is everything you need to know about replacing a roof with solar panels.
In most cases, yes.
Solar panels are designed to produce power for 25 years or more. A roof needs to match that timeline, or close to it, so the two age together instead of against each other. If your roof has only a few years of life left, installing panels on top of it is a mistake you will pay for twice.
Whether you’re asking, “Should I get a new roof before solar panels?” or “Should I replace my roof before going solar?” the answer is the same: If your roof is worn, replace it first.

A professional roof inspection is offered by most residential roofing service providers.
A thorough inspection looks at several things:
Plenty of homeowners come at this from the opposite direction. The panels are already up, the roof is aging, and now they are wondering how to replace a roof with solar panels.
It can be done, but it takes coordination. The panels are carefully removed, stored during the roofing project, and reinstalled once the new roof is complete.
Can you replace a roof without removing solar panels? Not really, at least not the section beneath the array, since the crew needs clear access to the roofing materials underneath.
Different roofs age at different rates and handle mounting differently, which shapes whether a replacement makes sense first.
Contact UsOne of the most overlooked aspects of a solar project is long-term accountability. When roofing and solar work are completed by separate contractors, diagnosing and resolving issues later can become more complex, particularly if questions arise about whether the roof or the solar installation is responsible.
A single roof replacement in Los Angeles paired with solar is the best way to go. Before you commit, run the numbers with a roof replacement calculator so the combined cost is clear from day one, and lean on a team that installs solar panels in Los Angeles alongside the roof itself.
The order you do things in is what separates a smart solar project from an expensive one. Replace your roof with solar panels already on top of it, and you pay twice. Put a new roof down first, and your panels have a clean, sound surface to sit on for their full 25-year life.
When both the roof and the panels are handled by an experienced team, your photovoltaic system rests on a sound foundation built to last its full lifespan. DLS Development has spent years roofing homes across Southern California, and they know how local roofs age, which materials suit the climate, and how to mount an array without compromising the surface below.
If you are weighing a roof and solar installation, get in touch.
If your roof is aging or worn, yes. Solar panels last 25 years or more, so replacing a tired roof first means you avoid removing and resetting the panels later.
Sometimes. If only the section beneath the array is failing, a partial replacement can work, but it is often a false economy. If the rest of the roof is close in age, replacing the whole thing while the panels are off usually costs less over time.
It can if the panels are removed and reset incorrectly. Using one qualified team for both the roof and the solar keeps the mounting sealed properly and protects both your roof warranty and your solar warranty.
Not the part under the array. The crew needs clear access to the roof decking, so panels over the work area have to be removed and reset. Sections away from the panels can sometimes be worked around.
Yes. In most cases, the same panels are carefully removed, stored, and reinstalled on the new roof, as long as they are still in good working condition and the racking is compatible.

Choose which categories you allow. Necessary cookies are required for the site to work and cannot be switched off.
Required for the site to function: security, load balancing, and remembering your cookie choice. These are always on.
Remembers choices you make, such as language, region, or layout.
Helps us understand how the site is used, which pages are read, and where visitors come from.
Used to measure advertising and to show you relevant ads on other sites.
Your browser sent a privacy signal, so advertising cookies have been switched off for you. You can change this at any time.